Close Menu
  • Home
  • Entertainment
  • National
  • International
  • Tech
  • Politics
  • Sports
  • PMNI
  • More
    • Business
    • Culture
    • Education
    • History
    • Health
  • Featured
    • Fishe Travel
    • Fishe Media
    • Fishe TV
Facebook X (Twitter) Instagram
FISHE NEWS
  • Home
  • Entertainment
  • National
  • International
  • Tech
  • Politics
  • Sports
  • PMNI
  • More
    • Business
    • Culture
    • Education
    • History
    • Health
  • Featured
    • Fishe Travel
    • Fishe Media
    • Fishe TV
Facebook X (Twitter) Instagram
FISHE NEWS
Home»Business»“Transmission Tower Collapse Affects Power Supply In Kaduna South”
Business

“Transmission Tower Collapse Affects Power Supply In Kaduna South”

Omolemi EboisetaleBy Omolemi EboisetaleSeptember 20, 2025No Comments2 Mins Read
Facebook Twitter Pinterest LinkedIn Tumblr Email
Share
Facebook Twitter LinkedIn Pinterest Email

A transmission tower owned by the Transmission Company of Nigeria (TCN) collapsed in the Rigasa community of Kaduna State on Thursday, September 18, 2025, disrupting power supply to parts of Kaduna South.

The collapse, TCN explained, was caused by a combination of severe weather conditions and vandalism. Tower No. 7 along the Kaduna Town Line I and II gave way during heavy rainfall and strong winds, and on-site inspections revealed that vandals had removed several critical components, weakening the structure.

“This incident highlights the twin challenges of natural hazards and human interference that our transmission infrastructure faces,” a TCN spokesperson said. “The removal of key components by vandals significantly contributed to the collapse.”

The power disruption affected several Kaduna Electric distribution load centres, particularly those serving the southern part of the city. In response, TCN instructed the Kaduna Electricity Distribution Company (KAEDCO) to temporarily link the 33kV Mogadishu feeder with the 33kV Abakwa feeder to ensure continued electricity supply to residents in the Mogadishu area.





Areas such as Kinkinau, Yan Tukwane, Kabala West, Unguwan Muazu, and parts of Kaduna North were reportedly unaffected and continued to receive normal power supply.

TCN engineers have begun dismantling the collapsed tower and are preparing to erect a replacement structure. The company reassured residents that all efforts are being made to restore full power transmission safely and promptly.

Ali Sharifa, General Manager of Transmission Service at TCN, emphasized the growing threat of infrastructure vandalism to Nigeria’s power sector. “We recorded 42 vandalism incidents in the first and second quarters of 2025, affecting 178 transmission towers nationwide. These attacks, combined with natural disasters, significantly disrupt the flow of electricity to our citizens,” he said.

Sharifa also highlighted other challenges faced by TCN, noting, “2024 and 2025 have been particularly trying years for us as we strive to provide uninterrupted power, with both vandals and natural hazards impacting key lines, including the Kainji-Birnin Kebbi 330kV SC line.”

The Transmission Company of Nigeria called on communities to report suspicious activities around transmission infrastructure and reiterated its commitment to safeguarding its facilities to ensure reliable electricity supply across the country.

#PowerSupply #TCN Electricity Energy Infrastructure Kaduna KAEDCO TransmissionTower Vandalism Weather
Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
Omolemi Eboisetale
  • Website

Related Posts

Nigeria’s Data Needs To Return Home. But Is Our Infrastructure Up To The Task?

October 4, 2026

Nigeria Begins Local Production Of Next-Generation Malaria Nets As Harvestfield Opens New Front In Health Manufacturing

October 2, 2026

From Appropriation To Impact: What The 2025 Budget Extension Means For Citizens

October 1, 2026

Comments are closed.

Here is spotlighting many benefits of journeying with either Lagos State’s Blueline or Redline rails for a hassle-free day, week, month and year. Thank God for the Igbega Eko. Together we rise.
https://youtu.be/V67GV8wgyjw

Latest Posts

  • Nigeria’s Data Needs To Return Home. But Is Our Infrastructure Up To The Task?
  • Nigeria Begins Local Production Of Next-Generation Malaria Nets As Harvestfield Opens New Front In Health Manufacturing
  • From Appropriation To Impact: What The 2025 Budget Extension Means For Citizens
  • Fuel Import Licence Ruling Opens New Front In Nigeria’s Battle Over Who Controls Petrol Supply
  • Nigeria’s Permanent UN Security Council Bid: A Strong Case for Africa, But A Weak Case For Nigeria Alone

LATEST POSTS

Nigeria’s Data Needs To Return Home. But Is Our Infrastructure Up To The Task?

October 4, 2026

Nigeria Begins Local Production Of Next-Generation Malaria Nets As Harvestfield Opens New Front In Health Manufacturing

October 2, 2026

From Appropriation To Impact: What The 2025 Budget Extension Means For Citizens

October 1, 2026

Fuel Import Licence Ruling Opens New Front In Nigeria’s Battle Over Who Controls Petrol Supply

September 30, 2026

Nigeria’s Permanent UN Security Council Bid: A Strong Case for Africa, But A Weak Case For Nigeria Alone

September 28, 2026

Subscribe to Updates

Get the latest news from FISHE about politics, economy, health and business, etc

Facebook X (Twitter) Instagram Pinterest
© 2026 ThemeSphere. Designed by ThemeSphere.

Type above and press Enter to search. Press Esc to cancel.