Close Menu
  • Home
  • Entertainment
  • National
  • International
  • Tech
  • Politics
  • Sports
  • PMNI
  • More
    • Business
    • Culture
    • Education
    • History
    • Health
  • Featured
    • Fishe Travel
    • Fishe Media
    • Fishe TV
Facebook X (Twitter) Instagram
FISHE NEWS
  • Home
  • Entertainment
  • National
  • International
  • Tech
  • Politics
  • Sports
  • PMNI
  • More
    • Business
    • Culture
    • Education
    • History
    • Health
  • Featured
    • Fishe Travel
    • Fishe Media
    • Fishe TV
Facebook X (Twitter) Instagram
FISHE NEWS
Home»Transportation»Lagos To Divert Traffic On December 20 For Pedestrian Bridge Repairs
Transportation

Lagos To Divert Traffic On December 20 For Pedestrian Bridge Repairs

“Temporary road closures and lane adjustments planned at Tincan First Gate, Apapa to ensure safe repair of the damaged pedestrian bridge.”
Adejuyigbe FrancisBy Adejuyigbe FrancisDecember 18, 2025No Comments2 Mins Read
Facebook Twitter Pinterest LinkedIn Tumblr Email
Share
Facebook Twitter LinkedIn Pinterest Email

The Lagos State Government (LASG), has announced a traffic diversion plan to facilitate urgent repair works on the damaged pedestrian bridge at Tincan First Gate, Apapa (inward Mile 2).

The repairs are scheduled for Saturday, 20th December 2025, from 9:00 a.m. to 1:00 p.m. and are being carried out by the Federal Ministry of Works through the Office of the Federal Controller of Works, Lagos.

Phased Repair and Traffic Management Plan

The bridge repairs will be executed in two key phases to ensure both commuter safety and minimal disruption to traffic:

Phase 1: Lifting and Placement of Bridge Beams

  • The road from Tincan, Apapa to Mile 2 will be completely closed for approximately 20 minutes while beams are lifted and installed.





  • Traffic will resume immediately after this operation is completed.

Phase 2: Lifting and Installation of Bridge Slabs

  • Vehicles traveling from Tincan, Apapa toward Mile 2 will continue to move but will be diverted into a single lane about 50 metres before the bridge work area.

  • Full access will be restored 50 metres after the work zone.

  • Traffic from Mile 2 to Tincan, Apapa will move freely throughout this phase.

Motorist Advisory

The Ministry of Transportation and traffic management officials have advised commuters to:

  • Exercise patience and cooperate with traffic personnel.

  • Allow extra travel time when passing through the affected corridor.

  • Follow all diversion signs and official instructions to ensure safety.

The Lagos State Government emphasized that these temporary closures are necessary for the safe repair and maintenance of the pedestrian bridge, which is crucial for daily commuter movement in the busy Tincan-Apapa corridor.

#Francis #traffic 20 Adegoke Adejuyigbe Bridge BRT Branding BRT TV December Divert Fishe Media Fishe News Lagos Marketing Comms Pedestrian PR Agency Repairs
Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
Adejuyigbe Francis
  • Website

Thought Leader, Idea Bank, Nation Builder.

Related Posts

Nigeria’s Data Needs To Return Home. But Is Our Infrastructure Up To The Task?

October 4, 2026

Nigeria Begins Local Production Of Next-Generation Malaria Nets As Harvestfield Opens New Front In Health Manufacturing

October 2, 2026

From Appropriation To Impact: What The 2025 Budget Extension Means For Citizens

October 1, 2026

Comments are closed.

Here is spotlighting many benefits of journeying with either Lagos State’s Blueline or Redline rails for a hassle-free day, week, month and year. Thank God for the Igbega Eko. Together we rise.
https://youtu.be/V67GV8wgyjw

Latest Posts

  • Nigeria’s Data Needs To Return Home. But Is Our Infrastructure Up To The Task?
  • Nigeria Begins Local Production Of Next-Generation Malaria Nets As Harvestfield Opens New Front In Health Manufacturing
  • From Appropriation To Impact: What The 2025 Budget Extension Means For Citizens
  • Fuel Import Licence Ruling Opens New Front In Nigeria’s Battle Over Who Controls Petrol Supply
  • Nigeria’s Permanent UN Security Council Bid: A Strong Case for Africa, But A Weak Case For Nigeria Alone

LATEST POSTS

Nigeria’s Data Needs To Return Home. But Is Our Infrastructure Up To The Task?

October 4, 2026

Nigeria Begins Local Production Of Next-Generation Malaria Nets As Harvestfield Opens New Front In Health Manufacturing

October 2, 2026

From Appropriation To Impact: What The 2025 Budget Extension Means For Citizens

October 1, 2026

Fuel Import Licence Ruling Opens New Front In Nigeria’s Battle Over Who Controls Petrol Supply

September 30, 2026

Nigeria’s Permanent UN Security Council Bid: A Strong Case for Africa, But A Weak Case For Nigeria Alone

September 28, 2026

Subscribe to Updates

Get the latest news from FISHE about politics, economy, health and business, etc

Facebook X (Twitter) Instagram Pinterest
© 2026 ThemeSphere. Designed by ThemeSphere.

Type above and press Enter to search. Press Esc to cancel.