Close Menu
  • Home
  • Entertainment
  • National
  • International
  • Tech
  • Politics
  • Sports
  • PMNI
  • More
    • Business
    • Culture
    • Education
    • History
    • Health
  • Featured
    • Fishe Travel
    • Fishe Media
    • Fishe TV
Facebook X (Twitter) Instagram
FISHE NEWS
  • Home
  • Entertainment
  • National
  • International
  • Tech
  • Politics
  • Sports
  • PMNI
  • More
    • Business
    • Culture
    • Education
    • History
    • Health
  • Featured
    • Fishe Travel
    • Fishe Media
    • Fishe TV
Facebook X (Twitter) Instagram
FISHE NEWS
Home»National»FG Sets June 2026 Deadline For N761bn Abuja-Kaduna-Kano Road Project
National

FG Sets June 2026 Deadline For N761bn Abuja-Kaduna-Kano Road Project

Omolemi EboisetaleBy Omolemi EboisetaleSeptember 20, 2025No Comments2 Mins Read
Facebook Twitter Pinterest LinkedIn Tumblr Email
Share
Facebook Twitter LinkedIn Pinterest Email

The Federal Government, through the Minister of Works, David Umahi, has instructed contractors handling the N761 billion Abuja-Kaduna-Kano Road to strictly follow the project timeline, emphasizing milestone completion over relying solely on payment certificates.

Umahi stated, “We can’t stay in the office and know what is going on on the field. Site inspection, sharing ideas are key to the success of any engineering project.”

During an inspection tour of sections 1, 2, and 3 of the road on Saturday, Umahi highlighted the use of reinforced concrete and flexible asphalt pavement to ensure durability and long-term functionality. He added, “We want to commend the contractors and we also want to frown seriously at the pace of work because my integrity is at stake if we don’t complete the project in 14 months.”

Sections 1 and 3, covering a total of 118 kilometers, are valued at N252 billion, with 30% of the funds already disbursed, while Section 2 spans 72 kilometers, including 15 kilometers of flexible asphalt, costing N507 billion with over N150 billion already paid. Umahi said, “The President has been fully briefed, and this project is a priority initiative for his administration, aimed at boosting connectivity, security, and economic growth across Northern Nigeria.”





He further expressed confidence that the road, once completed, would leave a lasting legacy. “We tagged the project as rebuilding Abuja-Kaduna-Zaria-Kano road by President Bola Tinubu. He has so much passion that the road be completed and he’s funding it as a priority project,” Umahi added, urging contractors to accelerate work while encouraging young engineers to study the modern construction techniques being applied on the project.

#Contractors #Umahi Abuja Bola David Economic FG Growth Infrastructure June 2026 Kaduna Kano Road Tinubu
Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
Omolemi Eboisetale
  • Website

Related Posts

BREAKING IN THE NEWS: Several Feared Dead As Helicopter Crashes In Igbokoda, Ondo State

October 5, 2026

100 Days To Nigeria’s 2027 Election: The Ballot, The Battle And The Burden

October 5, 2026

Nigeria’s Data Needs To Return Home. But Is Our Infrastructure Up To The Task?

October 4, 2026

Comments are closed.

Here is spotlighting many benefits of journeying with either Lagos State’s Blueline or Redline rails for a hassle-free day, week, month and year. Thank God for the Igbega Eko. Together we rise.
https://youtu.be/V67GV8wgyjw

Latest Posts

  • BREAKING IN THE NEWS: Several Feared Dead As Helicopter Crashes In Igbokoda, Ondo State
  • 100 Days To Nigeria’s 2027 Election: The Ballot, The Battle And The Burden
  • Nigeria’s Data Needs To Return Home. But Is Our Infrastructure Up To The Task?
  • Nigeria Begins Local Production Of Next-Generation Malaria Nets As Harvestfield Opens New Front In Health Manufacturing
  • From Appropriation To Impact: What The 2025 Budget Extension Means For Citizens

LATEST POSTS

BREAKING IN THE NEWS: Several Feared Dead As Helicopter Crashes In Igbokoda, Ondo State

October 5, 2026

100 Days To Nigeria’s 2027 Election: The Ballot, The Battle And The Burden

October 5, 2026

Nigeria’s Data Needs To Return Home. But Is Our Infrastructure Up To The Task?

October 4, 2026

Nigeria Begins Local Production Of Next-Generation Malaria Nets As Harvestfield Opens New Front In Health Manufacturing

October 2, 2026

From Appropriation To Impact: What The 2025 Budget Extension Means For Citizens

October 1, 2026

Subscribe to Updates

Get the latest news from FISHE about politics, economy, health and business, etc

Facebook X (Twitter) Instagram Pinterest
© 2026 ThemeSphere. Designed by ThemeSphere.

Type above and press Enter to search. Press Esc to cancel.