Close Menu
  • Home
  • Entertainment
  • National
  • International
  • Tech
  • Politics
  • Sports
  • PMNI
  • More
    • Business
    • Culture
    • Education
    • History
    • Health
  • Featured
    • Fishe Travel
    • Fishe Media
    • Fishe TV
Facebook X (Twitter) Instagram
FISHE NEWS
  • Home
  • Entertainment
  • National
  • International
  • Tech
  • Politics
  • Sports
  • PMNI
  • More
    • Business
    • Culture
    • Education
    • History
    • Health
  • Featured
    • Fishe Travel
    • Fishe Media
    • Fishe TV
Facebook X (Twitter) Instagram
FISHE NEWS
Home»National»FG Rejects Overpriced N279bn Proposal From Julius Berger For Second Niger Bridge Bypass
National

FG Rejects Overpriced N279bn Proposal From Julius Berger For Second Niger Bridge Bypass

Omolemi EboisetaleBy Omolemi EboisetaleAugust 8, 2024No Comments2 Mins Read
Facebook Twitter Pinterest LinkedIn Tumblr Email
Share
Facebook Twitter LinkedIn Pinterest Email

The Federal Government, through the Minister of Works, Senator David Umahi, has rejected Julius Berger Plc’s proposed cost of N279 billion for the construction of the Second Niger Bridge Bypass, deeming it excessively high.

In a statement released on Thursday, Senator Umahi expressed disappointment with the construction giant’s pricing, highlighting that the original government estimate for the 17.27-kilometer dual carriageway was N133 billion.

“Julius Berger presented a figure almost twice our estimate, at N279 billion,” Umahi remarked, pointing out that the company’s proposal significantly exceeded the Ministry’s calculations.

Umahi further revealed that the Ministry of Works had decided to refer the project back to the Bureau of Public Procurement (BPP) and invite more contractors to bid.





“This involves public funds, and we must ensure transparency and value for money,” the Minister emphasized.

The Ministry also reviewed Julius Berger Plc’s performance on other ongoing projects, including the Lagos-Ibadan Expressway phase 2, raising concerns over the condition of some of these projects.

According to Umahi, “We changed the pavement elements from asphalt to concrete, and our revised estimate is N153 billion. However, Julius Berger’s proposal was N258 billion, which is unacceptable.”

With negotiations ongoing since September 2023, the Ministry has decided to terminate the existing contract with Julius Berger for this project.

The Federal Government will now seek a ‘No Objection’ from the BPP to proceed with selective tendering. The revised estimate of N153 billion and Julius Berger’s N258 billion proposal will be submitted to the BPP, and other contractors will be invited to bid.

The tendering process is expected to conclude within the next month to ensure the timely completion of the Second Niger Bridge Bypass.

#Julius Berger Federal government Second Niger Bridge
Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
Omolemi Eboisetale
  • Website

Related Posts

Nigeria’s Data Needs To Return Home. But Is Our Infrastructure Up To The Task?

October 4, 2026

Nigeria Begins Local Production Of Next-Generation Malaria Nets As Harvestfield Opens New Front In Health Manufacturing

October 2, 2026

From Appropriation To Impact: What The 2025 Budget Extension Means For Citizens

October 1, 2026

Comments are closed.

Here is spotlighting many benefits of journeying with either Lagos State’s Blueline or Redline rails for a hassle-free day, week, month and year. Thank God for the Igbega Eko. Together we rise.
https://youtu.be/V67GV8wgyjw

Latest Posts

  • Nigeria’s Data Needs To Return Home. But Is Our Infrastructure Up To The Task?
  • Nigeria Begins Local Production Of Next-Generation Malaria Nets As Harvestfield Opens New Front In Health Manufacturing
  • From Appropriation To Impact: What The 2025 Budget Extension Means For Citizens
  • Fuel Import Licence Ruling Opens New Front In Nigeria’s Battle Over Who Controls Petrol Supply
  • Nigeria’s Permanent UN Security Council Bid: A Strong Case for Africa, But A Weak Case For Nigeria Alone

LATEST POSTS

Nigeria’s Data Needs To Return Home. But Is Our Infrastructure Up To The Task?

October 4, 2026

Nigeria Begins Local Production Of Next-Generation Malaria Nets As Harvestfield Opens New Front In Health Manufacturing

October 2, 2026

From Appropriation To Impact: What The 2025 Budget Extension Means For Citizens

October 1, 2026

Fuel Import Licence Ruling Opens New Front In Nigeria’s Battle Over Who Controls Petrol Supply

September 30, 2026

Nigeria’s Permanent UN Security Council Bid: A Strong Case for Africa, But A Weak Case For Nigeria Alone

September 28, 2026

Subscribe to Updates

Get the latest news from FISHE about politics, economy, health and business, etc

Facebook X (Twitter) Instagram Pinterest
© 2026 ThemeSphere. Designed by ThemeSphere.

Type above and press Enter to search. Press Esc to cancel.