Close Menu
  • Home
  • Entertainment
  • National
  • International
  • Tech
  • Politics
  • Sports
  • PMNI
  • More
    • Business
    • Culture
    • Education
    • History
    • Health
  • Featured
    • Fishe Travel
    • Fishe Media
    • Fishe TV
Facebook X (Twitter) Instagram
FISHE NEWS
  • Home
  • Entertainment
  • National
  • International
  • Tech
  • Politics
  • Sports
  • PMNI
  • More
    • Business
    • Culture
    • Education
    • History
    • Health
  • Featured
    • Fishe Travel
    • Fishe Media
    • Fishe TV
Facebook X (Twitter) Instagram
FISHE NEWS
Home»Business»“Metering Drive In Nigeria: Q3 2025 Sees 228,614 New Installations, Coverage Still Below 60%”
Business

“Metering Drive In Nigeria: Q3 2025 Sees 228,614 New Installations, Coverage Still Below 60%”

NERC reports incremental gains in metering, underscoring the need for faster rollout and regulatory enforcement.
Adejuyigbe FrancisBy Adejuyigbe FrancisJanuary 7, 2026No Comments3 Mins Read
Facebook Twitter Pinterest LinkedIn Tumblr Email
Share
Facebook Twitter LinkedIn Pinterest Email

The Nigerian Electricity Regulatory Commission (NERC), has revealed that Electricity Distribution Companies (DisCos), installed 228,614 electricity meters across Nigeria between July and September 2025. This represents a slight increase from the previous quarter and reflects the ongoing effort to close the Nigeria’s longstanding metering gap, which leaves millions of consumers reliant on estimated billing.

Metering Progress and Coverage

As of September 30, 2025, only 6,661,564 out of 12,030,315 registered electricity customers were metered, representing 55.37% nationwide coverage. This means over 5 million customers remain unmetered, highlighting the scale of the challenge.

The 228,614 meters installed in Q3 marked a 0.73% increase from the 226,959 meters installed in Q2 2025. Under the Meter Asset Provider (MAP), framework—the dominant metering programme—176,302 meters, or roughly 77.12%, were deployed.

Other frameworks contributed smaller numbers:

  • Vendor-Financed installations: 44,104 meters (≈19.3%)





  • Distribution Sector Recovery Programme (DISREP): 7,902 meters

  • Meter Acquisition Fund (MAF): 175 meters

  • DisCo-Financed installations: 131 meters

Regionally, Ibadan, Aba, and Abuja DisCos led in installations, while some DisCos, including Port Harcourt and Jos, recorded declines compared to the previous quarter.

Individual DisCos’ Metering Performance

Performance among DisCos varied significantly, reflecting both operational efficiency and regional challenges:

Top Performers

  • Eko and Ikeja DisCos have metering rates above 84%, maintaining leadership in customer coverage.

  • Abuja and Ibadan DisCos recorded steady gains, contributing significantly to Q3 and Q4 installations.

  • Aba Power improved from around 69.5% to over 78% in metering coverage, reflecting a concentrated rollout effort.

Lagging DisCos

  • Enugu, Jos, Kaduna, Kano, and Yola DisCos remain below 50% coverage, indicating that millions of customers are still unmetered.

  • Challenges include logistical issues, financing gaps, and limited engagement with private meter providers, slowing the nationwide metering drive.

These differences underscore the uneven progress in Nigeria’s electricity sector: while some regions see rapid improvements, others lag behind, prolonging the reliance on estimated billing.

Consumer Implications

The large unmetered population faces continued billing uncertainty, often receiving electricity bills based on estimatesrather than actual consumption. To mitigate consumer grievances, NERC maintains monthly energy caps for unmetered customers, limiting charges according to feeder capacity and historical consumption data.

Accurate metering is critical for:

  • Transparency in billing

  • Improved revenue collection for DisCos

  • Better planning and reliability in electricity supply

Policy and Funding Drivers

Several initiatives support the metering rollout:

  • Meter Asset Provider (MAP), framework

  • Meter Acquisition Fund (MAF), in “Tranche B” deployment

  • Distribution Sector Recovery Programme (DISREP), backed by a $500 million World Bank loan

Despite these mechanisms, the pace of meter deployment remains insufficient to close the national gap quickly, prompting calls for enhanced financing, stricter enforcement, and operational efficiency among DisCos.

Outlook

The Q3 2025 data highlights incremental progress in Nigeria’s power metering drive, but also persistent structural and operational challenges:

  • 228,614 new meters installed show steady growth

  • National coverage remains just over 55%, leaving millions unmetered

  • DisCo performance is uneven, with top performers demonstrating the impact of strong management and underperformers revealing ongoing systemic issues

Closing Nigeria’s metering gap will require coordinated efforts among regulators, distribution companies, funding agencies, and private sector partners.

Accurate metering not only ensures fair billing but also strengthens revenue collection, investment confidence, and consumer trust—all essential for a more reliable electricity sector.

#Discos 2025 228 60 614 Adegoke BRT & Train Branding Electricity Fishe Media Fishe News Fishe Power Francis Adejuyigbe Installations Marketing Comms Metering Nigeria PR Q3
Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
Adejuyigbe Francis
  • Website

Thought Leader, Idea Bank, Nation Builder.

Related Posts

Nigeria’s Fintech Boom Comes With A New National Responsibility

November 17, 2026

A Nation Can’t Move Forward With Yesterday’s Laws

November 13, 2026

LAGOS 2027: Why Obafemi Hamzat Stands Head And Shoulders Above The Opposition

November 12, 2026

Comments are closed.

Here is spotlighting many benefits of journeying with either Lagos State’s Blueline or Redline rails for a hassle-free day, week, month and year. Thank God for the Igbega Eko. Together we rise.
https://youtu.be/V67GV8wgyjw

Latest Posts

  • Nigeria’s Fintech Boom Comes With A New National Responsibility
  • A Nation Can’t Move Forward With Yesterday’s Laws
  • LAGOS 2027: Why Obafemi Hamzat Stands Head And Shoulders Above The Opposition
  • Addressing Organised Unauthorised Migration To The United States
  • Tinubu: The All-Round Leader Driving Nigeria’s Renaissance And Celebrating The Flamingos’ Global Triumph

LATEST POSTS

Nigeria’s Fintech Boom Comes With A New National Responsibility

November 17, 2026

A Nation Can’t Move Forward With Yesterday’s Laws

November 13, 2026

LAGOS 2027: Why Obafemi Hamzat Stands Head And Shoulders Above The Opposition

November 12, 2026

Addressing Organised Unauthorised Migration To The United States

November 8, 2026

Tinubu: The All-Round Leader Driving Nigeria’s Renaissance And Celebrating The Flamingos’ Global Triumph

November 5, 2026

Subscribe to Updates

Get the latest news from FISHE about politics, economy, health and business, etc

Facebook X (Twitter) Instagram Pinterest
© 2026 ThemeSphere. Designed by ThemeSphere.

Type above and press Enter to search. Press Esc to cancel.