Close Menu
  • Home
  • Entertainment
  • National
  • International
  • Tech
  • Politics
  • Sports
  • PMNI
  • More
    • Business
    • Culture
    • Education
    • History
    • Health
  • Featured
    • Fishe Travel
    • Fishe Media
    • Fishe TV
Facebook X (Twitter) Instagram
FISHE NEWS
  • Home
  • Entertainment
  • National
  • International
  • Tech
  • Politics
  • Sports
  • PMNI
  • More
    • Business
    • Culture
    • Education
    • History
    • Health
  • Featured
    • Fishe Travel
    • Fishe Media
    • Fishe TV
Facebook X (Twitter) Instagram
FISHE NEWS
Home»National»Nigeria’s Power Sector Requires $10 Billion Annually For Revival, Says Minister Adelabu
National

Nigeria’s Power Sector Requires $10 Billion Annually For Revival, Says Minister Adelabu

Omolemi EboisetaleBy Omolemi EboisetaleApril 30, 2024No Comments2 Mins Read
Facebook Twitter Pinterest LinkedIn Tumblr Email
Share
Facebook Twitter LinkedIn Pinterest Email

The Minister of Power, Mr Adebayo Adelabu, has said that the Federal Government needs 10 billion dollars annually in the next ten years to revive the country’s power sector and overcome the liquidity hurdles.

Speaking at a one-day investigative hearing organized by the Senate Committee on Power in Abuja, Minister Adelabu emphasized the necessity of an annual investment of $10 billion over the next decade to revive the nation’s power sector and overcome its liquidity challenges.

Adelabu pointed out that while such an investment was imperative for the sector’s stability and growth, it was not feasible given the current size of the country’s budget. He noted the importance of attracting investors and lenders to the sector to facilitate its revival, stressing the need for commercial pricing to make it attractive for investment.

One of the major obstacles facing the power sector, according to Adelabu, is the absence of liquidity exacerbated by the subsidized tariff regime. He noted that the inability of the government to pay the outstanding N2.9 trillion subsidy was due to limited resources, necessitating measures to sustain the sector.





To address these challenges and improve power supply, the government is investing in various projects, including hydroelectric power plants such as the 700 megawatts Zungeru and the 40 megawatts Kashimbila projects. Additionally, investments are ongoing in 26 small hydropower dams across the country to boost electricity production.

However, members of the Senate Committee expressed concerns over the inefficiencies in the power sector, with Senator Ola Ashiru highlighting the burden placed on Nigerians due to these inefficiencies. He emphasized the need to protect vulnerable Nigerians and suggested a reconsideration of the recent tariff increase.

#Power Sector Minister of Power
Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
Omolemi Eboisetale
  • Website

Related Posts

BREAKING IN THE NEWS: Several Feared Dead As Helicopter Crashes In Igbokoda, Ondo State

October 5, 2026

100 Days To Nigeria’s 2027 Election: The Ballot, The Battle And The Burden

October 5, 2026

Nigeria’s Data Needs To Return Home. But Is Our Infrastructure Up To The Task?

October 4, 2026

Comments are closed.

Here is spotlighting many benefits of journeying with either Lagos State’s Blueline or Redline rails for a hassle-free day, week, month and year. Thank God for the Igbega Eko. Together we rise.
https://youtu.be/V67GV8wgyjw

Latest Posts

  • BREAKING IN THE NEWS: Several Feared Dead As Helicopter Crashes In Igbokoda, Ondo State
  • 100 Days To Nigeria’s 2027 Election: The Ballot, The Battle And The Burden
  • Nigeria’s Data Needs To Return Home. But Is Our Infrastructure Up To The Task?
  • Nigeria Begins Local Production Of Next-Generation Malaria Nets As Harvestfield Opens New Front In Health Manufacturing
  • From Appropriation To Impact: What The 2025 Budget Extension Means For Citizens

LATEST POSTS

BREAKING IN THE NEWS: Several Feared Dead As Helicopter Crashes In Igbokoda, Ondo State

October 5, 2026

100 Days To Nigeria’s 2027 Election: The Ballot, The Battle And The Burden

October 5, 2026

Nigeria’s Data Needs To Return Home. But Is Our Infrastructure Up To The Task?

October 4, 2026

Nigeria Begins Local Production Of Next-Generation Malaria Nets As Harvestfield Opens New Front In Health Manufacturing

October 2, 2026

From Appropriation To Impact: What The 2025 Budget Extension Means For Citizens

October 1, 2026

Subscribe to Updates

Get the latest news from FISHE about politics, economy, health and business, etc

Facebook X (Twitter) Instagram Pinterest
© 2026 ThemeSphere. Designed by ThemeSphere.

Type above and press Enter to search. Press Esc to cancel.