Close Menu
  • Home
  • Entertainment
  • National
  • International
  • Tech
  • Politics
  • Sports
  • PMNI
  • More
    • Business
    • Culture
    • Education
    • History
    • Health
  • Featured
    • Fishe Travel
    • Fishe Media
    • Fishe TV
Facebook X (Twitter) Instagram
FISHE NEWS
  • Home
  • Entertainment
  • National
  • International
  • Tech
  • Politics
  • Sports
  • PMNI
  • More
    • Business
    • Culture
    • Education
    • History
    • Health
  • Featured
    • Fishe Travel
    • Fishe Media
    • Fishe TV
Facebook X (Twitter) Instagram
FISHE NEWS
Home»Business»“IKEDC Signals Blackout In Lagos Areas Following ‘Jumper Cut’ At TCN Facility”
Business

“IKEDC Signals Blackout In Lagos Areas Following ‘Jumper Cut’ At TCN Facility”

“Technical Fault at Transmission Substation Triggers Outage, Restoration Efforts Underway”
Adejuyigbe FrancisBy Adejuyigbe FrancisDecember 10, 2025No Comments3 Mins Read
Facebook Twitter Pinterest LinkedIn Tumblr Email
Share
Facebook Twitter LinkedIn Pinterest Email

The Ikeja Electricity Distribution Company (IKEDC), has informed customers that there is a power outage affecting parts of its network — specifically around the Ogba, Ikeja, and Alausa axis of Lagos.

According to a message making media rounds, the outage was triggered by a “jumper cut” at the injection substation operated by Transmission Company of Nigeria (TCN). A “jumper cut” refers to a fault that occurs when a jumper cable — a high‑voltage cable that helps connect transmission infrastructure — is damaged, disconnected, or intentionally severed, disrupting the flow of electricity.

“Dear Customer, the current power outage is due to a 132kV jumper cut at the TCN Injection Substation (ISS),” the notice read. “The TCN technical team is already working to clear the fault to ensure supply is restored as soon as possible.”

IKEDC’s communications spokesperson, Kingsley Okotie, emphasized that the outage does not affect the company’s entire franchise area — only the specific affected customers received the outage notice. He added that IKEDC and TCN teams are already mobilised to resolve the issue.

One resident from Ogba, speaking anonymously to a reporter, expressed frustration: “No light in my area since yesterday.”





What this Means for Lagos Residents

The blackout serves as a reminder of how vulnerable power supply remains even in relatively urban and industrial zones of Lagos. For many households and businesses in Ogba, Ikeja, and Alausa, the outage could bring considerable inconvenience — from disrupted daily activities to potential losses for small businesses relying on electricity for operations.

While IKEDC indicates that the fault is isolated, the uncertainty around how long restoration may take can be challenging. The reference to a “jumper cut” suggests a transmission‑level problem, which may take time to assess and repair depending on the extent of the damage.

Broader Context: Transmission Faults Impacting Power Supply

This recent incident is not isolated. Over the past year, several outages and load‑shedding episodes in Lagos have been linked to faults on transmission infrastructure under TCN’s purview. For instance, earlier disruptions were traced to damage on 330 kV transmission lines feeding the region.

In August 2025, IKEDC even announced a long — though scheduled — outage spanning 25 days, tied to maintenance on a major transmission line (Omotosho–Ikeja West 330 kV), which significantly affected electricity distribution.

These repeated incidents underscore a structural vulnerability in the electricity supply chain: when transmission-level faults occur — whether due to equipment failure, maintenance issues, vandalism, or other causes — downstream consumers across a broad area often bear the brunt.

What Needs to Happen — and What Consumers Should Do

For sustainable improvement in power reliability:

  • Transmission infrastructure under TCN needs robust maintenance regimes, redundancy (backup lines), and rapid-response protocols for faults.

  • Distribution companies like IKEDC must improve communication clarity — indicating the scope of affected areas, expected restoration timeline, and contingency support where possible.

  • Customers should prepare for intermittent supply: having backup options (generators, UPS, inverters), and reporting faults promptly can help minimize disruptions.

For the residents of Ikorodu, Ikeja, Ogba, Alausa and other areas in IKEDC’s service zone, the hope is that TCN’s technical team will resolve the jumper‑cut fault swiftly so power can be restored.

#Francis #IKEDC #TCN Adegoke Adejuyigbe Blackout Electricity Facility Fishe News Jumper Cut Lagos PHCN
Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
Adejuyigbe Francis
  • Website

Thought Leader, Idea Bank, Nation Builder.

Related Posts

BREAKING IN THE NEWS: Several Feared Dead As Helicopter Crashes In Igbokoda, Ondo State

October 5, 2026

100 Days To Nigeria’s 2027 Election: The Ballot, The Battle And The Burden

October 5, 2026

Nigeria’s Data Needs To Return Home. But Is Our Infrastructure Up To The Task?

October 4, 2026

Comments are closed.

Here is spotlighting many benefits of journeying with either Lagos State’s Blueline or Redline rails for a hassle-free day, week, month and year. Thank God for the Igbega Eko. Together we rise.
https://youtu.be/V67GV8wgyjw

Latest Posts

  • BREAKING IN THE NEWS: Several Feared Dead As Helicopter Crashes In Igbokoda, Ondo State
  • 100 Days To Nigeria’s 2027 Election: The Ballot, The Battle And The Burden
  • Nigeria’s Data Needs To Return Home. But Is Our Infrastructure Up To The Task?
  • Nigeria Begins Local Production Of Next-Generation Malaria Nets As Harvestfield Opens New Front In Health Manufacturing
  • From Appropriation To Impact: What The 2025 Budget Extension Means For Citizens

LATEST POSTS

BREAKING IN THE NEWS: Several Feared Dead As Helicopter Crashes In Igbokoda, Ondo State

October 5, 2026

100 Days To Nigeria’s 2027 Election: The Ballot, The Battle And The Burden

October 5, 2026

Nigeria’s Data Needs To Return Home. But Is Our Infrastructure Up To The Task?

October 4, 2026

Nigeria Begins Local Production Of Next-Generation Malaria Nets As Harvestfield Opens New Front In Health Manufacturing

October 2, 2026

From Appropriation To Impact: What The 2025 Budget Extension Means For Citizens

October 1, 2026

Subscribe to Updates

Get the latest news from FISHE about politics, economy, health and business, etc

Facebook X (Twitter) Instagram Pinterest
© 2026 ThemeSphere. Designed by ThemeSphere.

Type above and press Enter to search. Press Esc to cancel.