Close Menu
  • Home
  • Entertainment
  • National
  • International
  • Tech
  • Politics
  • Sports
  • PMNI
  • More
    • Business
    • Culture
    • Education
    • History
    • Health
  • Featured
    • Fishe Travel
    • Fishe Media
    • Fishe TV
Facebook X (Twitter) Instagram
FISHE NEWS
  • Home
  • Entertainment
  • National
  • International
  • Tech
  • Politics
  • Sports
  • PMNI
  • More
    • Business
    • Culture
    • Education
    • History
    • Health
  • Featured
    • Fishe Travel
    • Fishe Media
    • Fishe TV
Facebook X (Twitter) Instagram
FISHE NEWS
Home»NERC»NERC Fines Eight DisCos ₦628 Million For Overbilling Unmetered Customers
NERC

NERC Fines Eight DisCos ₦628 Million For Overbilling Unmetered Customers

Adejuyigbe FrancisBy Adejuyigbe FrancisApril 12, 2025No Comments2 Mins Read
Facebook Twitter Pinterest LinkedIn Tumblr Email
Share
Facebook Twitter LinkedIn Pinterest Email

NERC Fines Eight DisCos ₦628 Million For Overbilling Unmetered Customers.

The Nigerian Electricity Regulatory Commission (NERC) has imposed a fine of ₦628,031,583.94 on eight electricity distribution companies (DisCos) for failing to comply with the approved monthly energy caps for unmetered customers in the third quarter of 2024.

 

In a statement issued on Thursday, NERC identified the sanctioned DisCos as Abuja, Eko, Enugu, Ikeja, Jos, Kaduna, Kano, and Yola. The companies were found to have breached the provisions of the commission’s 2020 Order on Capping of Estimated Bills (Order No: NERC/197/2020), which is designed to align estimated billing for unmetered customers with the actual consumption levels of those with meters on the same power feeders.





 

A review of billing data from July to September 2024 revealed that the affected DisCos had consistently overbilled unmetered customers, contrary to the regulatory cap. As a result, the commission levied fines totalling over ₦628 million, representing five per cent of the total naira value of the overbilling during the review period.

 

“The non-compliant DisCos have been sanctioned to pay fines amounting to six hundred and twenty-eight million, thirty-one thousand, five hundred and eighty-three naira and ninety-four kobo (₦628,031,583.94),” the statement read.

 

Beyond the monetary sanction, NERC has directed the DisCos to issue appropriate credit adjustments to all affected customers. These adjustments are to be completed no later than 15 May 2025, aligning with the end of the April 2025 billing cycle.

 

The Commission reaffirmed its commitment to protecting consumers and maintaining regulatory discipline within the Nigerian Electricity Supply Industry (NESI).

 

Meanwhile, in a separate development aimed at improving electricity supply in the South-East, the Enugu State Electricity Commission has granted a 5MW power generation licence to Tempo Power Solutions Limited. The company will establish a gas-fired plant to bolster energy capacity in the state.

 

NERC assured the public that it will continue to monitor compliance with its directives and hold operators accountable in order to ensure fair service delivery to all electricity consumers across Nigeria.

#Discos #NERC Electricity Fine Unmetered
Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
Adejuyigbe Francis
  • Website

Thought Leader, Idea Bank, Nation Builder.

Related Posts

BREAKING IN THE NEWS: Several Feared Dead As Helicopter Crashes In Igbokoda, Ondo State

October 5, 2026

100 Days To Nigeria’s 2027 Election: The Ballot, The Battle And The Burden

October 5, 2026

Nigeria’s Data Needs To Return Home. But Is Our Infrastructure Up To The Task?

October 4, 2026

Comments are closed.

Here is spotlighting many benefits of journeying with either Lagos State’s Blueline or Redline rails for a hassle-free day, week, month and year. Thank God for the Igbega Eko. Together we rise.
https://youtu.be/V67GV8wgyjw

Latest Posts

  • BREAKING IN THE NEWS: Several Feared Dead As Helicopter Crashes In Igbokoda, Ondo State
  • 100 Days To Nigeria’s 2027 Election: The Ballot, The Battle And The Burden
  • Nigeria’s Data Needs To Return Home. But Is Our Infrastructure Up To The Task?
  • Nigeria Begins Local Production Of Next-Generation Malaria Nets As Harvestfield Opens New Front In Health Manufacturing
  • From Appropriation To Impact: What The 2025 Budget Extension Means For Citizens

LATEST POSTS

BREAKING IN THE NEWS: Several Feared Dead As Helicopter Crashes In Igbokoda, Ondo State

October 5, 2026

100 Days To Nigeria’s 2027 Election: The Ballot, The Battle And The Burden

October 5, 2026

Nigeria’s Data Needs To Return Home. But Is Our Infrastructure Up To The Task?

October 4, 2026

Nigeria Begins Local Production Of Next-Generation Malaria Nets As Harvestfield Opens New Front In Health Manufacturing

October 2, 2026

From Appropriation To Impact: What The 2025 Budget Extension Means For Citizens

October 1, 2026

Subscribe to Updates

Get the latest news from FISHE about politics, economy, health and business, etc

Facebook X (Twitter) Instagram Pinterest
© 2026 ThemeSphere. Designed by ThemeSphere.

Type above and press Enter to search. Press Esc to cancel.