Close Menu
  • Home
  • Entertainment
  • National
  • International
  • Tech
  • Politics
  • Sports
  • PMNI
  • More
    • Business
    • Culture
    • Education
    • History
    • Health
  • Featured
    • Fishe Travel
    • Fishe Media
    • Fishe TV
Facebook X (Twitter) Instagram
FISHE NEWS
  • Home
  • Entertainment
  • National
  • International
  • Tech
  • Politics
  • Sports
  • PMNI
  • More
    • Business
    • Culture
    • Education
    • History
    • Health
  • Featured
    • Fishe Travel
    • Fishe Media
    • Fishe TV
Facebook X (Twitter) Instagram
FISHE NEWS
Home»National»House Of Reps Uncover Federal Polytechnic With 142 Students
National

House Of Reps Uncover Federal Polytechnic With 142 Students

Adejuyigbe FrancisBy Adejuyigbe FrancisDecember 4, 2024No Comments3 Mins Read
Facebook Twitter Pinterest LinkedIn Tumblr Email
Share
Facebook Twitter LinkedIn Pinterest Email

Federal Polytechnic Ugep: House Committee Uncovers Imbalance in Staff and Student Numbers.

The House of Representatives Committee on Polytechnics and other Higher Technical Education has raised concerns over the Federal Polytechnic, Ugep, in Cross River State. The institution, established in 2021, currently has only 142 students but employs 154 academic and non-academic staff, with expenditures exceeding N600 million.  

 

This revelation was made during the committee’s oversight visit to Federal Polytechnics in the South-South region. The Chairman of the Committee, Fouad Laguda (APC, Lagos), criticised the institution’s operations and described its spending as unsustainable.





 

The Rector of the Polytechnic, Professor Edward N. Okey, explained the challenges faced since the institution’s inception. He revealed that the polytechnic initially struggled to secure a temporary site in Ugep, a small town with limited infrastructure. Eventually, the management renovated dilapidated buildings of the Ugep Community Secondary School, abandoned for 25 years, to serve as a temporary campus.

 

Professor Okey detailed that N2 billion from the institution’s take-off grant was used for renovations and construction projects, including a perimeter fence, a guest house, and a school of engineering. Despite these efforts, the institution continues to grapple with low enrolment, which the Rector attributed partly to a lingering historical stigma attached to Ugep.

 

He stated, “Even my Council members initially refused to hold meetings in Ugep due to old myths about the area. However, those beliefs are long outdated. We’ve been working tirelessly to erase such stigmas and attract more students.”

 

The polytechnic started with 16 students and now has 142, including those absorbed from the state-owned Institute of Technology and Management (ITM), which previously had only 63 students since its establishment in 2012.

 

Despite these efforts, committee members expressed dissatisfaction with the institution’s financial management. One member remarked, “A federal polytechnic with 142 students spending nearly N500 million on personnel and N159 million on overhead is unjustifiable. This is not sustainable.”

 

Chairman Laguda also criticised the poor preparation of institutions for the oversight review, stating that none of the invited schools from the region met expectations. “Out of the seven schools invited, only three submitted partial reports, while others were underprepared. We will recall these institutions for a follow-up review,” he said.

 

The committee has requested a detailed budget review and additional clarifications from the polytechnic’s management, with a follow-up session expected within a week.

 

This development highlights the ongoing challenges facing some newly established institutions in Nigeria, raising questions about resource allocation and sustainability.

Federal Polytechnic Ugep House of Rep
Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
Adejuyigbe Francis
  • Website

Thought Leader, Idea Bank, Nation Builder.

Related Posts

BREAKING IN THE NEWS: Several Feared Dead As Helicopter Crashes In Igbokoda, Ondo State

October 5, 2026

100 Days To Nigeria’s 2027 Election: The Ballot, The Battle And The Burden

October 5, 2026

Nigeria’s Data Needs To Return Home. But Is Our Infrastructure Up To The Task?

October 4, 2026

Comments are closed.

Here is spotlighting many benefits of journeying with either Lagos State’s Blueline or Redline rails for a hassle-free day, week, month and year. Thank God for the Igbega Eko. Together we rise.
https://youtu.be/V67GV8wgyjw

Latest Posts

  • BREAKING IN THE NEWS: Several Feared Dead As Helicopter Crashes In Igbokoda, Ondo State
  • 100 Days To Nigeria’s 2027 Election: The Ballot, The Battle And The Burden
  • Nigeria’s Data Needs To Return Home. But Is Our Infrastructure Up To The Task?
  • Nigeria Begins Local Production Of Next-Generation Malaria Nets As Harvestfield Opens New Front In Health Manufacturing
  • From Appropriation To Impact: What The 2025 Budget Extension Means For Citizens

LATEST POSTS

BREAKING IN THE NEWS: Several Feared Dead As Helicopter Crashes In Igbokoda, Ondo State

October 5, 2026

100 Days To Nigeria’s 2027 Election: The Ballot, The Battle And The Burden

October 5, 2026

Nigeria’s Data Needs To Return Home. But Is Our Infrastructure Up To The Task?

October 4, 2026

Nigeria Begins Local Production Of Next-Generation Malaria Nets As Harvestfield Opens New Front In Health Manufacturing

October 2, 2026

From Appropriation To Impact: What The 2025 Budget Extension Means For Citizens

October 1, 2026

Subscribe to Updates

Get the latest news from FISHE about politics, economy, health and business, etc

Facebook X (Twitter) Instagram Pinterest
© 2026 ThemeSphere. Designed by ThemeSphere.

Type above and press Enter to search. Press Esc to cancel.