Close Menu
  • Home
  • Entertainment
  • National
  • International
  • Tech
  • Politics
  • Sports
  • PMNI
  • More
    • Business
    • Culture
    • Education
    • History
    • Health
  • Featured
    • Fishe Travel
    • Fishe Media
    • Fishe TV
Facebook X (Twitter) Instagram
FISHE NEWS
  • Home
  • Entertainment
  • National
  • International
  • Tech
  • Politics
  • Sports
  • PMNI
  • More
    • Business
    • Culture
    • Education
    • History
    • Health
  • Featured
    • Fishe Travel
    • Fishe Media
    • Fishe TV
Facebook X (Twitter) Instagram
FISHE NEWS
Home»Technology»Submarine Cable: MainOne Restores Some Services, Working To Fully Restore Internet Connectivity
Technology

Submarine Cable: MainOne Restores Some Services, Working To Fully Restore Internet Connectivity

Editor FrancisBy Editor FrancisMarch 17, 2024Updated:March 17, 2024No Comments3 Mins Read
Facebook Twitter Pinterest LinkedIn Tumblr Email
Share
Facebook Twitter LinkedIn Pinterest Email

MainOne, a Digital Infrastructure Service Provider on Saturday said that it had restored service to some customers and was actively working on restoring all services through capacity acquired on available cable systems.

The organisation made this known via a statement on its website in response to news reports that it would take two weeks to five weeks for it to restore internet services.

The statement said that the estimated repair time that it had earlier declared was for its submarine cable fault to be fixed.

“The repair time is to enable our services to become fully restored and independently supply capacity to customers.





“We have already restored services to some customers and are actively working on restoring services to others via capacity acquired on available cable systems,’’ the statement said.

Earlier, MainOne said that it recognised the impact of the outage and was working tirelessly to make available the restoration of capacity for temporal relief where feasible.

“We are very optimistic that our cable will be repaired as planned and services fully restored so that we can continue to operate with continued integrity of the submarine cable,” it said.

The News Agency of Nigeria (NAN) recalls that the Nigerian Communication Commission (NCC) had said that the internet disruptions being experienced by organisations, banks, and individuals were a result of damage affecting major undersea cables near Abidjan in Côte d’Ivoire.

The NCC said that the damage was causing downtime across West and South African countries.

It said that the cuts occurred somewhere in Cote d’Ivoire and Senegal, with an attendant disruption in Portugal.

It said that cable companies – West African Cable System (WACS) and African Coast to Europe (ACE) in the West Coast route from Europe – had experienced faults, while SAT3 and MainOne had downtime.

The regulatory body added that similar undersea cables providing traffic from Europe to the East Coast of Africa, like Seacom, Europe India Gateway (EIG), Asia-Africa-Europe 1 (AAE1), were said to have been cut at some point around the Red Sea.

This, it said, resulted in degradation of services across these routes.

NAN reports further that in an earlier statement, MainOne had declared a force majeure on its contractual obligations while explaining steps to restore connectivity.

The force majeure is an unforeseeable circumstance that prevents someone from fulfilling a contract.

The unforeseen circumstances may be natural disasters (fire, storms, floods), governmental or societal actions (war, invasion, civil unrest, labour strikes), or infrastructure failures (transportation, energy).

MainOne, an Equinix company, is one of the leading data centre and connectivity solution providers with a presence in Nigeria, Ghana and Cote d’Ivoire. (NAN)

#Submarine Cables
Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
Editor Francis
  • Website

Related Posts

100 Days To Nigeria’s 2027 Election: The Ballot, The Battle And The Burden

October 5, 2026

Nigeria’s Data Needs To Return Home. But Is Our Infrastructure Up To The Task?

October 4, 2026

Nigeria Begins Local Production Of Next-Generation Malaria Nets As Harvestfield Opens New Front In Health Manufacturing

October 2, 2026

Comments are closed.

Here is spotlighting many benefits of journeying with either Lagos State’s Blueline or Redline rails for a hassle-free day, week, month and year. Thank God for the Igbega Eko. Together we rise.
https://youtu.be/V67GV8wgyjw

Latest Posts

  • 100 Days To Nigeria’s 2027 Election: The Ballot, The Battle And The Burden
  • Nigeria’s Data Needs To Return Home. But Is Our Infrastructure Up To The Task?
  • Nigeria Begins Local Production Of Next-Generation Malaria Nets As Harvestfield Opens New Front In Health Manufacturing
  • From Appropriation To Impact: What The 2025 Budget Extension Means For Citizens
  • Fuel Import Licence Ruling Opens New Front In Nigeria’s Battle Over Who Controls Petrol Supply

LATEST POSTS

100 Days To Nigeria’s 2027 Election: The Ballot, The Battle And The Burden

October 5, 2026

Nigeria’s Data Needs To Return Home. But Is Our Infrastructure Up To The Task?

October 4, 2026

Nigeria Begins Local Production Of Next-Generation Malaria Nets As Harvestfield Opens New Front In Health Manufacturing

October 2, 2026

From Appropriation To Impact: What The 2025 Budget Extension Means For Citizens

October 1, 2026

Fuel Import Licence Ruling Opens New Front In Nigeria’s Battle Over Who Controls Petrol Supply

September 30, 2026

Subscribe to Updates

Get the latest news from FISHE about politics, economy, health and business, etc

Facebook X (Twitter) Instagram Pinterest
© 2026 ThemeSphere. Designed by ThemeSphere.

Type above and press Enter to search. Press Esc to cancel.