Close Menu
  • Home
  • Entertainment
  • National
  • International
  • Tech
  • Politics
  • Sports
  • PMNI
  • More
    • Business
    • Culture
    • Education
    • History
    • Health
  • Featured
    • Fishe Travel
    • Fishe Media
    • Fishe TV
Facebook X (Twitter) Instagram
FISHE NEWS
  • Home
  • Entertainment
  • National
  • International
  • Tech
  • Politics
  • Sports
  • PMNI
  • More
    • Business
    • Culture
    • Education
    • History
    • Health
  • Featured
    • Fishe Travel
    • Fishe Media
    • Fishe TV
Facebook X (Twitter) Instagram
FISHE NEWS
Home»National»Federal Government Issues 13 Power Generation
National

Federal Government Issues 13 Power Generation

Omolemi EboisetaleBy Omolemi EboisetaleJanuary 16, 2024No Comments2 Mins Read
Facebook Twitter Pinterest LinkedIn Tumblr Email
Share
Facebook Twitter LinkedIn Pinterest Email

The Federal Government, through the Nigerian Electricity Regulatory Commission (NERC), has granted 13 new licences for power generation, distribution, and trading. 

The latest development, as revealed in the third quarter 2023 report, brings a cumulative 40.9 megawatts to the nation’s electricity capacity.

 

The licenses, issued for off-grid and embedded power generation, independent electricity distribution, and electricity trading, aim to address the country’s persistent power challenges.





Notably, five new off-grid generation licenses, generating 8.81MW, and an embedded generation license for 5MW were among those issued during the review period.

 

Daybreak Power Solutions Limited received eight licenses for various off-grid power generation projects spanning Lagos, Abia, Borno, Kano, Oyo, and Abuja.

Additionally, Ekiti Independent Power Project secured a license for a 5MW gas-fired embedded power project in Ekiti State, contributing to the diversification of power sources.

 

Olokiti Power Distribution Limited obtained an Independent Electricity Distribution Network license operational in Ekiti State, while Ember Power Limited received an electricity trading license. Island Power Limited also secured a license for a 10MW embedded gas-fired power project in Lagos.

 

The issuance of licenses is part of ongoing efforts by the Federal Government and power sector operators to address the country’s electricity deficit, which has led to frequent blackouts in both urban and rural areas.

Nigeria currently generates between 3,500MW and 5,000MW for its over 200 million population, prompting initiatives to bolster power supply.

 

Despite the investments made in the sector, power consumer groups continue to criticize the insufficient electricity supply. In June 2023, Nigeria was identified as the country with the largest number of people lacking access to electricity.

The recent licenses aim to contribute to narrowing this gap, supporting the government’s commitment to improving the electricity landscape and delivering reliable power to all Nigerians.

 

#FG #NERC
Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
Omolemi Eboisetale
  • Website

Related Posts

BREAKING IN THE NEWS: Several Feared Dead As Helicopter Crashes In Igbokoda, Ondo State

October 5, 2026

100 Days To Nigeria’s 2027 Election: The Ballot, The Battle And The Burden

October 5, 2026

Nigeria’s Data Needs To Return Home. But Is Our Infrastructure Up To The Task?

October 4, 2026

Comments are closed.

Here is spotlighting many benefits of journeying with either Lagos State’s Blueline or Redline rails for a hassle-free day, week, month and year. Thank God for the Igbega Eko. Together we rise.
https://youtu.be/V67GV8wgyjw

Latest Posts

  • BREAKING IN THE NEWS: Several Feared Dead As Helicopter Crashes In Igbokoda, Ondo State
  • 100 Days To Nigeria’s 2027 Election: The Ballot, The Battle And The Burden
  • Nigeria’s Data Needs To Return Home. But Is Our Infrastructure Up To The Task?
  • Nigeria Begins Local Production Of Next-Generation Malaria Nets As Harvestfield Opens New Front In Health Manufacturing
  • From Appropriation To Impact: What The 2025 Budget Extension Means For Citizens

LATEST POSTS

BREAKING IN THE NEWS: Several Feared Dead As Helicopter Crashes In Igbokoda, Ondo State

October 5, 2026

100 Days To Nigeria’s 2027 Election: The Ballot, The Battle And The Burden

October 5, 2026

Nigeria’s Data Needs To Return Home. But Is Our Infrastructure Up To The Task?

October 4, 2026

Nigeria Begins Local Production Of Next-Generation Malaria Nets As Harvestfield Opens New Front In Health Manufacturing

October 2, 2026

From Appropriation To Impact: What The 2025 Budget Extension Means For Citizens

October 1, 2026

Subscribe to Updates

Get the latest news from FISHE about politics, economy, health and business, etc

Facebook X (Twitter) Instagram Pinterest
© 2026 ThemeSphere. Designed by ThemeSphere.

Type above and press Enter to search. Press Esc to cancel.